Shivo Towers has begun construction on a residential development in Paje, Zanzibar, following strong off-plan sales and a two-year approval process. The foundation programme comprises 180 reinforced concrete piles, each one metre in diameter and extending 18 metres underground, representing 3,240 linear metres of piling in total. According to the developer, this extensive foundation system is an engineering response to the building's distinctive architectural design, which places greater structural demands on individual supporting pillars than a conventional development.
The architectural vision, created by Muchmore Architectural Design of Sardinia, Italy, features soaring ceilings, expansive balconies, floor-to-ceiling glass and uninterrupted ocean views. Richard Ashby, Chief Executive Officer of Shivo, explained that achieving this level of openness requires a different structural approach. The high ceilings give the building an overall structural height comparable to a conventional building with more than 13 floors, while the wide spans between supporting columns and expansive balconies concentrate greater loads on individual pillars. The foundation system has been designed to accommodate loads associated with a structure of more than 15 floors, Ashby said.
The structural engineering design was created by YMA Structural Engineers in Dubai, while the piling works are being undertaken by Mediterranean Group, a German-owned specialist contractor based in Dar es Salaam. The foundation system incorporates dynamic and static load testing, with test loads reaching up to 1,200 tonnes. The piles and their supporting infrastructure, including pile caps and a base slab with a combined thickness of 1.5 metres, reflect the company's emphasis on getting the fundamentals right. During a recent government site visit, an official described Shivo Towers as potentially the strongest building in Zanzibar's history, according to the developer.
Ashby said the response during the off-plan sales period had been encouraging and that commencement of construction marked an important transition from planning to physical delivery. The company faced changes in permit requirements during the two-year approval process that necessitated amendments to the original design, before the full building permit was granted. Paje has emerged as one of Zanzibar's prominent tourism and property investment destinations, and Shivo Towers is intended to contribute to this growth through contemporary residential development that combines the area's coastal appeal with distinctive architecture.
